FBE/2FBE Pipe External Coating Production Line

new time:2015/3/7 10:06:02


 

FBE/2FBE Pipe External Coating Production Line

 

Note:1、Pipe incoming rack  2、Spiral conveyor for blasting line  3、Gas preheating furnace  4、Pipe external blasting machine  5、Blasted pipe outgoing rack  6、Pipe internal blowing device  7、Inspection platform  8、Linear conveyor for waste pipe return  9、Waste pipe return rack  10、Spiral conveyor for coating line  11、IF heating device  12、FBE spraying device  13、Cooling tower device  15、Pipe coating cooling room  16、Coated pipe outgoing rack  17、End-of-pipe treatment device  18、Finished pipe outgoing rack

 

 

Technical Parameter

S.N.

Name

Technical parameters

1

Pipe diameter

Φ101~Φ1219mm

2

Pipe length

8~12.5m

3

Voltage、frequency

380v/220v、50HZ

4

Total power

About 4300KW

5

Air pressure

0.4~0.6Mpa

6

The compressor pressure/throughput

0.8Mpa/10X2m3

7

Water consumption

2% of the total water amount

8

Productivity

300-400m2/hr

 

contact

Langfang Dingsheng Mechanical Equipment Co., Ltd

Tel:86-0316-2207771

86-0316-2207773

Tel:18831688900

Fax:86-0316-2231218

E-mail:dshjx@vip.sina.com

Add:NO. 198, AI'MIN ST. EAST, LANGFANG,HEBEI, CHINA